Raise the Roof

 Sheathing is almost done!
The dormer rafters have all been cut but only some of them have been installed because we have to attach the security post under the dormer frame overhang. Most of the hurricane ties have been put up and Jacob spent several hours making 16 bird blocks and put up 4. The bird blocks discourage rodents and birds from living in our ceiling and also helps with ventilation.
All of the first story sheathing has been put on except for the front wall. The second story sheathing was put up (thank you James for helping) except for the rear wall. and the roof sheathing has been put up except for the loft and the dormer. There is still framing to be done in the storage loft and the roof sheathing needs to be finished.