Translate

Tuesday, June 28, 2016

Gypsy Sunshine

 We're one coat in on the yellow paint!
Jacob & Marie installed siding behind the fascia up close it gives a finished look. They evened out the siding in preparation for the corner trim. Jacob, Jeff, Marie and I have been hard at work getting the first layer of yellow on the siding. Marie mixed this color of yellow from some of the paints that we got from our neighbor. Jacob cut the corner molding, Jeff and I primed it so hopefully this week that will get put up.
Jacob sanded the bed loft ceiling plywood and Marie painted the back for moisture mitigation and applied varathane to the front. The last of the insulation was installed on the loft. The electrical wiring was also completed for the loft. This week Jacob and Marie should be able to get the ceiling in the bed loft installed. Jacob has also been working on a small wall nook that I asked him to customize as a bedside table replacement.

No comments:

Post a Comment